UAS Site Survey
Rising Tide Technology Group · Site Assessment
Site Information
Site Name
Location (address)
Date
Completed By
Completed By β Email
Section 1 · Site P.O.C's
Comments
For each item answered YES above, an explanation is required (reference the section & item number).
Maps & Illustration
The pin follows the Location address above. Fine-tune by clicking/dragging the map, or enter coordinates directly.
Latitude
Longitude
FAA overlays:
Source: FAA Aeronautical Information Services
Operating area:
Draw with the β± / β tools on the map, or
LAANC ceiling (ft AGL):
0
50
100
200
300β400
No pin set. Search, type coordinates, or click the map.
Report map panels β three snippets captured from this site (satellite, sectional, UASFM grid).
Satellite
Sectional Chart (snippet)
UASFM Facility Grid (snippet)
Site Photos
Attach site pictures (launch/recovery areas, hazards, obstructions, etc.). They print and save with the survey.
Site Approval
The operational area listed on this form has been approved for use by the following individual:
Name
Position
Signature & Date
Approver Email (optional β for Slack @mention)
Site Survey Notes & Amendment Recommendations
Pre-Shift Risk Assessment
Site survey done? Head over to the per-shift Risk Assessment to score today’s conditions before you fly.
β Launch Risk Assessment β